Light equipment:

Dimmers:
48 x 10A, Zero88 Betarack. (6 channelracks X 8)

Mixers:
MA Lighting GrandMa Ultralight, or: ADB Tango 48 (48 faders).

Fixtures:
40 X PAR64, 1000W (Thomas, Pulsaar..)
11 + 4 Whisper scrollers for parcans (in permanent positions!)
6 X Robe 250 AT Spots. (Permanently installed back of stage. Height adjustments are possible.)
4 X ETC SourceFour Zoomprofiles 750W (15-30 degrees)
4 X Floorcans 1000W.

Multi-cables permanently installed over stage and hall. 14 extension cables. (Schuko)
Some standard light gels.

Hazer:
Look Unique 2

Mirrorballs:
2 X 40cm with motors.

Mountings:
A.
Downstage/proscenium: A permanent standing truss (ø48.3mm Litec QD40 truss, 0.40m X 0.40m). Outer width: 13m. Outer heigth: approx. 6m. Maximum point load: 360kg. Max total load, evenly distributed over the truss: 1200kg. (The PA-speakers are hanging permanently in this truss.)

B.
Upstage/Back of stage: A permanent truss, laying from the each side of the outer walls. (ø48.3mm Litec QD40 truss, 0.40m X 0.40m) Used for backlightning, backdrops etc. Outer width: 14.5m. Height from stagefloor: Approx. 4,2m. Maximum point load: 200kg. Max total load, evenly distributed over the truss: 600kg.

C.
Front of stage: Bar/pipe in iron for front ligthting (øs48.3mm) is hanging in wires, approx. 3,5m away from the stage. Operated manually by winch. Width: 12m. Maximum height: 5,5m. Maximum point load by the 4 wire points: 50kg. Max total load, evenly distributed over the pipe: 100kg.

D.
4 iron bars/pipes (ø48.3mm) mounted vertically mounted on sides of the hall. 2 pipes on both sidewalls, 5m and 8m away from the stage. Height: approx. 5.5m.

All's clear